Today I added commissioning checklists to the download area. The Word file contains pre-commissioning checklists for the following equipment:
- Agitator
- Blower
- Column
- Column (packed)
- Drum / Vessel
- Fan (air cooled FD)
- Filter (sand)
- Heater (fired)
- Pump (proportional, metering, reciprocating)
- Pump (centrifugal)
- Reactor
- Tank
- Turbine (steam)
A preview of each checklist you can find here.
In order to download the Word file you need to be registered.
Already registered users can login using the form on the right.
Are you already logged in? Here is the direct access to the download area.
To your success!
Thomas Stuenkel



