
Today I added more than one pre-commissioning checklist (in detail: 13) to the download area. The Word file contains pre-commissioning checklists for the following equipment: Agitator Blower Column Column (packed) Drum / Vessel Fan (air cooled FD) Filter (sand) Heater (fired) Pump (proportional, metering, reciprocating) [...]